Friday, November 29, 2013

PROGRESS (FACADE)

This is my idea for the facade. I'm planning on applying a panel in the south face to diffuse the sunlight that goes into the guest rooms with an black-and-white image of Brooklyn perhaps by Ansel Adams.


Tuesday, November 26, 2013

DESIGN PROGRESS (LAYOUT)

This are just a new layout of the plans scaled down. I wonder what I should put in the visual corridor  (from the first level to fourth) since is big enough to accommodate an space through out the all its levels. Also the floor of the corridor continues to shift.

GROUND LEVEL

FIRST LEVEL

SECOND LEVEL

THIRD LEVEL

FOURTH LEVEL

FIFTH LEVEL

Sunday, November 17, 2013

PROGRESS

This is not definitive and there's a lot of work to be done. There is a long way to go, but we are already half way in. Almost there!

Saturday, November 9, 2013

PROGRAMMATIC STUDY AND DEVELOPMENT

Here is a layout of my program in my massing, which has some notes of what needs to be change and the spaces that need to be relocated. Note that is not to scale.

FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR